Four Storey Apartment Block, Banbury
June 2018 – September 2018 – Cherwell Council

MMK Civils have been awarded the groundwork and civil engineering on this new project. Works consist of excavation and breaking down of pile caps and installation of a new re-inforced steel mat and 450mm deep concrete slab including the installation and casting of 40 no sets of HD bolts to carry the steel frame building, all setting out and accuracy checks on all works and HD bolts by MMK’s direct engineers. Also included is the new drainage installation to include all internal and external drainage including rising main and new septic tank installation. Works on a labour, plant and materials basis