New Block Paved Driveway
Overstone, Northampton
February 2025

MMK completed all Groundworks and Surfacing on this new residential driveway. The old surface had failed and sunk in places, we removed the old surface, extended the drive to accommodate a footpath area to the front door…

Kingsthorpe, New Block Paving Driveway & Vehicle Access/Drop Kerb
May 2024

On this project we installed a large new drop kerb and vehicle access to allow off road parking. We also had the job of installing a new block paved driveway…

Abington, New block paved driveway & tarmac drop kerb access​
April 2024

Groundworks and surfacing for a new block paved driveway and tarmac drop kerb, full dig out and removal, including installation of new surface water drainage…

Driveway & Vehicle Crossover / Drop Kerb, Northampton
March 2022

New residential driveway and construction of a new vehicle crossover and drop kerb in Northampton. Driveway constructed and surfaced using Marshall’s Keyblok in charcoal with a natural (grey)…

Weston Favell Village, New Driveway in Tegula Block Paving & Drop Kerb Extension
February 2022

Construction of a new driveway using Marshall’s Tegula Drivesett block paving in Charcoal and construction of a vehicle crossover / drop kerb extension.

Hako Depot,
Northamptonshire

September 2019 – October 2019 

MMK complete on a project in Northamptonshire. Our clients wanted a new modern external area and re-configured parking details to the front entrance of their head office. As you can see works included reduced excavation and new kerbing, surface water drainage and new block paved pedestrian areas walkways…

Section 278 Works,
Northampton
August 2018 – October 2018 – Willmott Dixon Construction

MMK Civils Ltd have secured the Section 278 works on this site in Northampton. Works include the excavation and installation of circa 100m2 of block paved parking area for a vehicle garage and excavation and construction of a new bellmouth entrance including kerbing, tactile paving crossovers and asphalt surfacing and thermoplastic lining to complete. We also have in the package the construction of a new traffic island and bollards to suit the new road layout….