Delapre Abbey, Northampton
January 2018, Northampton Council
On this project MMK Civils Ltd have installed a 45,000 litre, 5.4m x 3.5m x 4.5m deep water storage tank at Delapre Abbey in Northampton on behalf of Northampton Council. Works included excavation of 150m3 of soil (5.0m deep dig), hydraulic shoring and edge protection installation, concrete base and anchor irons installed, water storage tank safely installed and concrete surrounded and shoring removal. All works in accordance with specific RAMS and temp works design, re-inforcing MMK’s solid focus on health and safety.