NHS Community Diagnostics Centre, Northampton – Groundworks & Surfacing
August 2025
MMK Civil Engineers & Surfacing Ltd have completed the Groundworks and Surfacing works at this NHS Community Diagnostic Centre in Northampton for an existing client.
Works consisted of:
- Replacement of an existing slabbed footpath, with the new footpath levels adjusted and widened
- Removal of redundant PCC edgings at various locations and infilling with topsoil
- Construction of a new cycle hoop stand concrete base (reinforced brush finished concrete)
- Construction of a new slabbed footpath with new PCC edgings, and 600mm x 600mm paving slabs
- Removal and relocation of existing NHS signage
- Removal of existing hand rails and making good of the block paving
This is another project for an existing client, on another NHS project, we recently completed a full Groundworks, Civil Engineering & Surfacing package at Kettering General Hospital for the same client.