Project Whaddon, Bletchley
Feb 2017 – Ongoing – Willmott Partnership Homes Ltd – Value undisclosed

Similar to Project Kenilworth, the first stage of this project is to break out and remove a large area of an existing concrete slab and remove from site.

MMK will be importing material to make up levels for the new access roads and footpaths and utilising heavy compaction plant to ensure the stabilisation of the sub base for the new infrastructure.

Again MMK will be installing all storm and foul drainage including another large attenuation system including all necessary Earth work support for the deep drainage and attenuation works to meet with the standards of the Willmott Dixon safety culture. This will include a 4 metre deep connection onto the existing main drainage with all necessary Earth Work Support to ensure the safety of MMK operatives and all site staff.

Foundations works for all plots will be carried out with brickwork below DPC being placed in MMK’S order, to include a Litecast Block and Beam system on all plots.

All externals which include tarmac surfacing and paving works and the Section 278 works to form the new entrance into the new development will be carried out by MMK. MMK will also be excavating and installing all mains services to reach the new plots from the highway boundary.

Again this project is on a Labour, Plant and Materials basis including all Setting Out by MMK’s directly employed Setting Out Engineers.