RC HGV Loading Bays, Northamptonshire
March 2019 – Ongoing – Synergy Healthcare
MMK Civils Ltd have been awarded this project at an industrial depot in Northamptonshire. Works consist of the excavation for new HGV loading bays to allow the Client to install HGV wheel alignment fittings to keep up with the latest health and safety standards for their operatives working on and around the loading bays in the 24 hour busy depot. Installation of re-inforcement and drilling and doweling into the existing slabs and pouring of structural concrete slabs and worked finish to the concrete surface.
Please select an image to see a larger version and scroll through all images