Resurfacing Projects
Olney, Car Park Resurfacing and New Lining Layout
September 2021
Resurfacing of an existing pub/restaurant car park in Olney. This project consisted of groundworks and kerb replacement, replacement of a failed surface water drainage channel…
Barnwell Country Park
Oundle
March 2021
Groundworks preparation including surface water drainage to these previously waterlogged areas, installation of MOT type 1 and compaction…
Brixworth Country Park, Tarmac/Asphalt Track Resurfacing
December 2020
Groundworks preparation and installation of circa 500m2 of new asphalt / tarmac surfacing to footpaths and cycle paths at this Country Park for West Northamptonshire Council…
Brixworth Rural Business, Northamptonshire
July 2020
We received the order from this rural business in Northampton to upgrade the access road to their business premises. We installed new concrete edgings to both sides and imported new granular planings and compacted and trimmed utilising heavy compaction plant to bind the final surface course.
Cherwell District Council, Banbury
February 2020
We were given the order for the construction of a new block paving footpath at this site where we installed over 2000m2 of machine laid asphalt on the car park for these new apartments in Banbury, Oxfordshire.
Hako Depot,
Northamptonshire
September 2019 – October 2019
MMK complete on a project in Northamptonshire. Our clients wanted a new modern external area and re-configured parking details to the front entrance of their head office. As you can see works included reduced excavation and new kerbing, surface water drainage and new block paved pedestrian areas walkways…
RC Church, Rushden, Northamptonshire
July 2019
A small surfacing project by us at a church in Rushden, Northamptonshire for an existing client. Our client contacted us as the existing asphalt surfacing had failed due to poor sub-base and compaction…
Delapre Abbey, Northampton
September 2017 – February 2018 – Northampton Borough Council
MMK Civils Ltd were awarded this project in July 2017 and a commencement on site of 16th September 2017. This scheme consists of three phases. MMK will be Principal Contractor on this Project. MMK’s Setting Out Engineers and teams will commence on site 16th September 2017 to establish Site Compound and start enabling works for the Project. Phase One consists of the Construction of a new circa 3000m2 permeable surface car park which has a Construction detail of various Geotextile layers…